title-dbs

dbs-picture

The DBS Bank headquarters are located on the 15th, 16th and 17th floors of the Hsin Kong Financial Building which is in the highly populated and busy Central Business District of Taipei, Taiwan.

In an effort to completely rejuvenate the indoor environment and air quality of the space on these three floors, complete testing of indoor and outdoor air quality was done from the particulate standpoint.
The tests showed a very high level of particulates in excess of over 8 million particles per cubic foot of space in the indoor environment.

HealthWay’s commercial air purification systems were designed to treat 100% of air being supplied to these three floors. The systems were installed on the supply side of each air handling unit that was serving the space on each floor.

DBS Banks drastically improved the air quality in their headquarters by more than 99% by installing HealthWay’s commercial air purification systems.

The systems installed have the capacity to capture 99.99% of all particles down to the size of 0.002 microns.

Post install test results showed a decrease of more than 99% of particulates in the indoor space
with an average particle count of less than 100,000 particles per cubic foot.

.